Better Solution Engine
Infrastructure decisions can jump from a visible problem to a preferred project without testing root causes, lower-cost alternatives, maintenance capacity or distributional effects.
Explore interconnected problems, evidence, solutions and measurable public outcomes.
Explore all pillarsThe Better Solution Engine is a decision framework for moving from problem diagnosis to alternatives, pilot design, measurement and scale without treating one technology or vendor as the answer.
Infrastructure decisions can jump from a visible problem to a preferred project without testing root causes, lower-cost alternatives, maintenance capacity or distributional effects.
Test this cause against local institutions, assets, user experience and available evidence before treating it as established.
Test this cause against local institutions, assets, user experience and available evidence before treating it as established.
Test this cause against local institutions, assets, user experience and available evidence before treating it as established.
Test this cause against local institutions, assets, user experience and available evidence before treating it as established.
Test this cause against local institutions, assets, user experience and available evidence before treating it as established.
Test this cause against local institutions, assets, user experience and available evidence before treating it as established.
| Evidence area | What to measure | Important limitation |
|---|---|---|
| Problem | Place, users, severity and trend | Broad labels hide distinct causes |
| Mechanism | How the intervention produces change | Association is not causation |
| Alternative | Non-build and lower-cost options | Shortlists may be biased |
| Feasibility | Capability, finance and regulation | Pilot conditions may not scale |
| Outcome | Baseline, target, actual and distribution | Activity is not public benefit |
Define owner, cost, dependency, safeguard, baseline and decision gate before implementation.
Define owner, cost, dependency, safeguard, baseline and decision gate before implementation.
Define owner, cost, dependency, safeguard, baseline and decision gate before implementation.
Define owner, cost, dependency, safeguard, baseline and decision gate before implementation.
Define owner, cost, dependency, safeguard, baseline and decision gate before implementation.
Define owner, cost, dependency, safeguard, baseline and decision gate before implementation.
Record the responsible actor, evidence requirement and next decision.
Record the responsible actor, evidence requirement and next decision.
Record the responsible actor, evidence requirement and next decision.
Record the responsible actor, evidence requirement and next decision.
Record the responsible actor, evidence requirement and next decision.
Record the responsible actor, evidence requirement and next decision.
Publish baseline, target, actual result, date, geography, source and distribution.
Publish baseline, target, actual result, date, geography, source and distribution.
Publish baseline, target, actual result, date, geography, source and distribution.
Publish baseline, target, actual result, date, geography, source and distribution.
Publish baseline, target, actual result, date, geography, source and distribution.
Publish baseline, target, actual result, date, geography, source and distribution.
A tool is selected before the problem is understood.
Safeguard: Independent problem definition.The system becomes costly to exit or audit.
Safeguard: Open standards and exit clauses.A demonstration is mistaken for scale evidence.
Safeguard: Representative pilot and decision gates.Targets reward activity rather than outcome.
Safeguard: Balanced outcome and safeguard indicators.Submit a place, source, correction, working practice, implementation lesson or measured result.